Network Service Charges until 30 June 2024

General Electricity

basic rate €/monthVAT 0 %VAT 24 %
1x10 A ... 3x25 A5,636,98
3x35 A10,5613,09
3x50 A18,8323,35
3x63 A26,0432,29
3x80 A35,5444,07
3x100 A46,6357,82
3x125 A60,5375,06
3x160 A79,8999,06
transmission rate cents/kWh1,411,75

The maximum fuse size for general electricity is 3x160 A.

Night-time Electricity

basic rate €/monthVAT 0 %VAT 24 %
1x10 A ... 3x25 A15,1818,82
3x35 A22,1627,48
3x50 A32,6240,45
3x63 A41,6951,70
3x80 A53,5666,41
3x100 A67,5183,71
3x125 A84,96105,35
3x160 A109,38135,63
transmission rate daytime cents/kWh1,381,71
transmission rate night-time cents/kWh0,660,82

The maximum fuse size for night-time electricity is 3x160 A.

Seasonal Electricity

productVAT 0 %VAT 24 %
basic rate €/monthsee Night-time electricity
transmission rate winter business day, cents/kWh3,143,89
transmission rate other times, cents/kWh1,261,56

The maximum fuse size for seasonal electricity is 3x160 A.

Power Transmission LV

productVAT 0 %VAT 24%
basic rate €/month110,00136,40
active power rate €/kW, month2,603,22
reactive power rate €/quart, month1,762,18
transmission rate cents/kWh0,680,84

Medium-voltage Electricity (10/20 kV)

productVAT 0 %VAT 24 %
basic rate for each connection item, €/month580,00719,20
active power rate €/kW, month1,722,13
reactive power rate €/quart, month1,762,18
transmission rate cents/kWh0,610,76

Regional Network Electricity (110 kV)

productVAT 0 %VAT 24 %
basic rate €/month810,001 004,40
reactive power rate (inductive load) €/quart, month1,601,98
reactive power rate (capacitive load) €/quart, month1,601,98
transmission rate winter business day €/MWh11,3014,01
transmission rate other times, €/MWh4,545,63

Temporary Electricity

Temporary Electricity LVVAT 0 %VAT 24 %
basic rate general transfer basic rate doubled
transmission rate cents/kWh4,485,56
Temporary Electricity MV
basic rate €/kk780,00967,20
transmission rate cents/kWh1,86967,20

Electricity Tax (including fee for security of supply)

Electricity taxVAT 0 %VAT 24 %
tax bracket I cents/kWh2,253002,79372
tax bracket II cents/kWh0,063000,07812

The total prices listed in the rate schedule are shown without state electricity taxes included. Moreover, electricity taxes valid at any given moment are invoiced in electricity bill.

Industry, data centres, as well as professional greenhouse cultivation are eligible for Tax Bracket II. For more information on electricity taxes please contact Turku Energia customer service and Finnish Tax Administration.

Maintenance of an unused connection

The connector can maintain the connection according to the connection agreement without a valid network service agreement by paying for the maintenance of the connection

Low-voltage connection

maintenance charge €/monthVAT 0 %VAT 24 %
1x10 A … 3x25 A2,823,50
3x35 A5,286,55
3x50 A9,4111,67
3x63 A13,0216,14
3x80 A17,7722,03
3x100 A23,3128,90
3x125 A30,2737,53
3x160 A39,9449,53
3x200 A52,2464,78
3x250 A62,3077,25
3x315 A82,28102,03
3x400 A and over104,48129,56

Medium-voltage connection

maintenance charge €/monthVAT 0 %VAT 24 %
290,00359,60

Network Service Charges 1 July - 31 August 2024

General Electricity

basic rate €/monthVAT 0 %VAT 24 %
1x10 A ... 3x25 A6,087,54
3x35 A11,4014,14
3x50 A20,3425,22
3x63 A28,1234,87
3x80 A38,3847,59
3x100 A50,3662,45
3x125 A65,3781,06
3x160 A86,28106,99
transmission rate cents/kWh1,521,88

The maximum fuse size for general electricity is 3x160 A.

Night-time Electricity

basic rate €/monthVAT 0 %VAT 24 %
1x10 A ... 3x25 A16,3920,32
3x35 A23,9329,67
3x50 A35,2343,69
3x63 A45,0355,84
3x80 A57,8471,72
3x100 A72,9190,41
3x125 A91,76113,78
3x160 A118,13149,48
transmission rate daytime cents/kWh1,491,85
transmission rate night-time cents/kWh0,710,88

The maximum fuse size for night-time electricity is 3x160 A.

Seasonal Electricity

productVAT 0 %VAT 24 %
basic rate €/monthsee Night-time electricity
transmission rate winter business day, cents/kWh3,394,20
transmission rate other times, cents/kWh1,361,69

The maximum fuse size for seasonal electricity is 3x160 A.

Power Transmission LV

productVAT 0 %VAT 24 %
basic rate €/month118,80147,31
active power rate €/kW, month2,813,48
reactive power rate €/quart, month1,902,36
transmission rate cents/kWh0,730,91

Medium-voltage Electricity (10/20 kV)

productVAT 0 %VAT 24 %
basic rate for each connection item, €/month626,40776,74
active power rate €/kW, month1,862,31
reactive power rate €/quart, month1,902,36
transmission rate cents/kWh0,660,82

Regional Network Electricity (110 kV)

productVAT 0 %VAT 24 %
basic rate €/month874,801084,75
reactive power rate (inductive load) €/quart, month1,732,15
reactive power rate (capacitive load) €/quart, month1,732,15
transmission rate winter business day €/MWh12,2015,13
transmission rate other times, €/MWh4,906,08

Temporary Electricity

Temporary Electricity LVVAT 0 %VAT 24 %
basic rate general transfer basic rate doubled
transmission rate cents/kWh4,846,00
Temporary Electricity MV
basic rate €/kk780,00967,20
transmission rate cents/kWh1,862,31

Electricity Tax (including fee for security of supply)

Electricity taxVAT 0 %VAT 24 %
tax bracket I cents/kWh2,253002,79372
tax bracket II cents/kWh0,063000,07812

The total prices listed in the rate schedule are shown without state electricity taxes included. Moreover, electricity taxes valid at any given moment are invoiced in electricity bill.

Industry, data centres, as well as professional greenhouse cultivation are eligible for Tax Bracket II. For more information on electricity taxes please contact Turku Energia customer service and Finnish Tax Administration.

Maintenance of an unused connection

The customer can maintain the connection according to the connection agreement without a valid network service agreement by paying for the maintenance of the connection

Low-voltage connection

maintenance charge €/monthVAT 0 %VAT 24 %
1x10 A … 3x25 A3,043,77
3x35 A5,707,07
3x50 A10,1712,61
3x63 A14,0617,43
3x80 A19,1923,80
3x100 A25,1831,22
3x125 A32,6940,53
3x160 A43,1453,49
3x200 A56,4269,96
3x250 A70,5287,44
3x315 A88,86110,19
3x400 A and over112,84139,92

Medium-voltage connection

maintenance charge €/monthVAT 0 %VAT 24 %
290,00359,60

Network Service Charges from 1 September 2024

General Electricity

basic rate €/monthVAT 0 %VAT 25,5 %
1x10 A ... 3x25 A6,087,63
3x35 A11,4014,31
3x50 A20,3425,53
3x63 A28,1235,29
3x80 A38,3848,17
3x100 A50,3663,20
3x125 A65,3782,04
3x160 A86,28108,28
transmission rate cents/kWh1,521,91

The maximum fuse size for general electricity is 3x160 A.

Night-time Electricity

basic rate €/monthVAT 0 %VAT 25,5 %
1x10 A ... 3x25 A16,3920,57
3x35 A23,9330,03
3x50 A35,2344,21
3x63 A45,0356,51
3x80 A57,8472,59
3x100 A72,9191,50
3x125 A91,76115,16
3x160 A118,13148,25
transmission rate daytime cents/kWh1,491,87
transmission rate night-time cents/kWh0,710,89

The maximum fuse size for night-time electricity is 3x160 A.

Seasonal Electricity

productVAT 0 %VAT 25,5 %
basic rate €/monthsee Night-time electricity
transmission rate winter business day, cents/kWh3,394,25
transmission rate other times, cents/kWh1,361,71

The maximum fuse size for seasonal electricity is 3x160 A.

Power Transmission LV

productVAT 0 %VAT 25,5 %
basic rate €/month118,80149,09
active power rate €/kW, month2,813,53
reactive power rate €/quart, month1,902,38
transmission rate cents/kWh0,730,92

Medium-voltage Electricity (10/20 kV)

productVAT 0 %VAT 25,5 %
basic rate for each connection item, €/month626,40786,13
active power rate €/kW, month1,862,33
reactive power rate €/quart, month1,902,38
transmission rate cents/kWh0,660,83

Regional Network Electricity (110 kV)

productVAT 0 %VAT 25,5 %
basic rate €/month874,801 097,87
reactive power rate (inductive load) €/quart, month1,732,17
reactive power rate (capacitive load) €/quart, month1,732,17
transmission rate winter business day €/MWh12,2015,31
transmission rate other times, €/MWh4,906,15

Temporary Electricity

Temporary Electricity LVVAT 0 %VAT 25,5 %
basic rate general transfer basic rate doubled
transmission rate cents/kWh4,846,07
Temporary Electricity MV
basic rate €/kk780,00978,90
transmission rate cents/kWh1,862,33

Electricity Tax (including fee for security of supply)

Electricity taxVAT 0 %VAT 25,5 %
tax bracket I cents/kWh2,253002,82752
tax bracket II cents/kWh0,063000,07907

The total prices listed in the rate schedule are shown without state electricity taxes included. Moreover, electricity taxes valid at any given moment are invoiced in electricity bill.

Industry, data centres, as well as professional greenhouse cultivation are eligible for Tax Bracket II. For more information on electricity taxes please contact Turku Energia customer service and Finnish Tax Administration.

Maintenance of an unused connection

The connector can maintain the connection according to the connection agreement without a valid network service agreement by paying for the maintenance of the connection

Low-voltage connection

maintenance charge €/monthVAT 0 %VAT 25,5 %
1x10 A … 3x25 A3.043,82
3x35 A5,077,15
3x50 A10,1712,76
3x63 A14,0617,65
3x80 A19,1924,08
3x100 A25,1831,60
3x125 A32,6941,02
3x160 A43,1454,14
3x200 A56,4270,81
3x250 A70,5288,50
3x315 A88,86111,52
3x400 A and over112,84141,61

Medium-voltage connection

maintenance charge €/monthVAT 0 %VAT 25,5 %
290,00363,95
  • Distribution of electricity is an electrical network service provided by the distribution network operator. Distribution of electricity refers to the delivery of electricity between the parties to the exchange of electricity. The network service products listed in this rate schedule include the distribution of electrical power on the main power grid by the seller to the point of use within the distribution network owned by Turku Energia Sähköverkot Oy in a manner compliant with the Electricity Market Act.

  • The power transmission products listed in the rate schedule are available to customers within the distribution network area of Turku Energia Sähköverkot Oy.

  • Subject to restrictions set out in these terms of sale, from this rate schedule the customer can choose the network product, which is best suited for the current requirements.

  • The selected product can be replaced after one year at the earliest.

  • The maximum size of fuse for GENERAL, NIGHT and SEASONAL ELECTRICITY is 3x160A.

  • For products with different transmission prices for daytime and night-time (NIGHT and SEASONAL ELECTRICITY), night-time is defined as the time between 22 PM and 07 AM (current local time).

  • In SEASONAL ELECTRICITY winter business days are weekdays from Monday to Saturday between 1 November and 31 March between 7 AM and 22 PM.

  • In REGIONAL NETWORK ELECTRICITY winter business days are weekdays from Monday to Friday between 1 December - 28 February (29 February) between 7 AM and 21 PM.

  • Basic charges for network products specified in the rate schedule include a fee for the measuring instrument that covers the maintenance of the meter required for the measurement of electricity consumption.

  • Switching to another network product (Product change) requires that the electricity point of use has meters which can be used to measure the product billing variables in a manner acceptable to the owner of the distribution network. If a product change requires alterations to meters, a separate meter installation charge in accordance with the metering rate schedule shall be charged.

  • If the customer has no valid electricity supply contract with any electricity supplier, the local distribution network operator is obliged to cut off the supply of electricity to the place of use.

  • The customer can maintain the electrical connection in accordance with the connection agreement without a valid network contract by paying the charges for the maintenance of the connection specified in this rate schedule.

  • When the connection is moved to maintenance, the connection cable is turned voltage free and the energy meter(s) are removed.

  • The customer may be supplied with electricity for temporary use (e.g. for a worksite) without a connection agreement under a special temporary transmission rate schedule for no more than 2 years.

  • The peak power metering period used for determining the active power rate is one hour. The active power transmission billed is metered around the clock every day of the year. The amount of billable power transmission is determined as an average of the two highest monthly power consumption levels on a sliding 12-month scale.

  • The reactive power (inductive load) transmission rate is based on the monthly reactive power (inductive load) peak level, from which 20% of the active power peak level for the same month is subtracted.

  • The reactive power (capacitive load) transmission rate is based on the monthly reactive power (capacitive load) peak level, from which 10% of the active power peak level for the same month is subtracted.

  • Transmission of reactive power to the distribution network is not allowed for low and medium voltage network online service products.

  • If the electricity consumption in a highvoltage apparatus is metered for lowvoltage and the transformer substation and attendant equipment are owned by the customer, a 2% surcharge will be added to both the power rates (kW, quarter) and power transmission rates (kWh).

  • Service fees specified on the Service Price List of Turku Energia Sähköverkot Oy will be charged for the initiation of electricity supply and other comparable one-off measures related to the supply of electricity.

  • In addition to these application guidelines, the power network service is subject to the valid Terms of Power Network Service issued by Turku Energia Sähköverkot Oy.